Pre-Qualification: Design and Construction of Conveyance Pipeline for the Regional Reuse System, Package 1: Forcemain and Pumping Station South Amman to Madaba WWTP (EXtended)

14th September 2025 Comments Off on Pre-Qualification: Design and Construction of Conveyance Pipeline for the Regional Reuse System, Package 1: Forcemain and Pumping Station South Amman to Madaba WWTP (EXtended)

Design and Construction of Conveyance Pipeline for the Regional Reuse System, Package 1: Forcemain and […]

Read more
Translate »